Serving Tampa, Orlando, Fort Lauderdale, Miami and beyond
Before & After
Click on a photo to enlarge.
Our team at LRE Foundation Repair recently assisted Timothy B. from Clearwater, FL with a tripping hazard caused by his uneven driveway. After conducting a thorough whole home inspection, our Design Specialists found unstable soils to be the root cause of the sinking and unlevel surface. To fix this issue, we used our PolyLevel solution, a fast-expanding polyurethane foam, to fill voids, solidify loose soils, and lift the concrete slabs back to a level position. Not only did we restore Timothy's driveway to its original condition, but we also provided a lasting solution that prevents future soil settling. Now, Timothy and his family can enjoy a hazard-free driveway worry-free!
Cheryl from Clearwater, FL, contacted LRE Foundation Repair for an inspection of her home’s crawl space after noticing areas of her floors felt unstable when walked on. We sent one of our expert Design Specialists to assess the structural support and identify the underlying issues.
During the inspection, it was discovered that several of the block piers supporting the floor joists had settled, compromising the stability of the flooring above. While temporary measures such as cinder blocks and bottle jacks had been used, they were not sufficient to provide reliable, long-term support.
Our specialist recommended installing our state-of-the-art SmartJack system to permanently stabilize the floor joists. Cheryl agreed, and our team began by clearing debris from the crawl space before strategically installing each SmartJack to ensure proper support.
With the installation complete, Cheryl’s home is now fully stabilized, with the SmartJack system providing strong, reliable support from below.
Diana was preparing to list her home for sale in Belleair, Florida, and sought to ensure its maximum value by having the floors leveled and stabilized. She asked LRE Foundation Repair for assistance, and an expert Design Specialist visited her home to conduct a thorough inspection of the crawl space. The specialist discovered that, due to soil settlement, numerous block piers supporting the floor joists above had sunk, resulting in insufficient support for the floors above. To level the floors and provide permanent stabilization, the LRE team installed the SmartJack system in the crawl space. With this solution in place, the floors are now leveled and stabilized, ensuring that Diana's home is ready to be listed for sale at its highest potential value.