Separating Walls
The homeowner began to notice troubling signs of settlement in their pool deck, including spreading cracks and walls pulling apart.
Concrete Slab Cracks
The pool deck's concrete slabs had developed significant cracks, signaling that settlement was taking place.
Helical Pier Installation
The LRE team begins driving the helical piers deep into the ground until strong, load-bearing soil layers are reached.
Complete Helical Pier Installation
After the helical piers are driven to the proper depths, they are secured to the foundation's footer, transferring the home's weight to the stable, load-bearing soils. The LRE team then carefully lifts the foundation and backfills the excavated areas to restore a seamless appearance.